Skip to main content
Africa Development Tracker
Infrastructure projects since 1957
Projects
Skyscrapers
EN
FR
Sign In
Egypt | Africa Development Tracker
Egypt
All
Roads
Rail
Energy
Healthcare
Housing
Industrial
Port
Urban Development
Maritime
196
Total
17
In Progress
148
Completed
0
Stalled
Projects (196)
Renewable Energy Biomass
Cancelled
Kom Ombo Solar Power
Nationwide
Specific Investment Loan
0%
Renewable energy
Cancelled
Private Sector Wind Power Development Project
Nationwide
Specific Investment Loan
0%
Banking Institutions
Cancelled
STRENGTHENING POLICIES AND REGULATIONS TOWARDS PROMOTING RESPONSIBLE FINANCIAL INCLUSION IN EGYPT
Nationwide
Investment Project Financing
0%
Ports/Waterways
Cancelled
Egypt - Port Sector Development
Nationwide
Specific Investment Loan
0%
Development
Proposed
Climate Resilient Agri-Food Transformation Project
Nationwide
Investment Project Financing
0%
Development
Proposed
Cairo Alexandria Trade Logistics Development Project Guarantee
Nationwide
Investment Project Financing
0%
Other Transportation
Cancelled
EG-UT Infrastructure Development (to be dropped)
Nationwide
Specific Investment Loan
0%
Development
Cancelled
EG-Urban Transport Infrastructure Development
Nationwide
Investment Project Financing
0%
Development
Cancelled
Damietta - Cairo Inland Waterway Project
Nationwide
Specific Investment Loan
0%
Public Administration - Energy and Extractives
Completed
EGYPT Energy/Social Safety Nets Sector Reforms Technical Assistance
Nationwide
Investment Project Financing
0%
Waste Management
In progress
Improved Management of E-Waste and Healthcare Waste for Reduction of uPOPs Emissions
Nationwide
Investment Project Financing
0%
Development
Proposed
Egypt SOE Reform: Implementation of the State Ownership Policy PforR
Nationwide
Program-for-Results Financing
0%
Development
Cancelled
Egypt Labor Intensive Works and Employability
Nationwide
Investment Project Financing
0%
Renewable Energy Biomass
Completed
KUREIMAT SOLAR THERMAL HYBRID PROJECT
Nationwide
Specific Investment Loan
0%
Public Administration - Water, Sanitation and Waste Management
Completed
EG-Enhanced Water Resources Management
Nationwide
Investment Project Financing
0%
Development
Cancelled
El Sharkia Water, Wastewater & Solid Waste Utility Management Demonstration Project
Nationwide
Specific Investment Loan
0%
Development
Proposed
Generating Resilience Opportunities and Wealth for Thriving and Harmonious Egypt 2
Nationwide
Development Policy Lending
0%
Waste Management
Cancelled
Cairo Municipal Solid Waste Management Project
Nationwide
Investment Project Financing
0%
Agricultural Extension, Research, and Other Support Activities
Completed
Avian and Human Influenza Control and Prevention
Nationwide
Emergency Recovery Loan
0%
Social Protection
Cancelled
Egypt Community and Local Dev. Project
Nationwide
Specific Investment Loan
0%
Development
Proposed
Electricity Sector Decarbonization Project
Nationwide
Investment Project Financing
0%
Development
Cancelled
Equal Access and Simplified Environment for Investment Project - Phase II
Nationwide
Investment Project Financing
0%
Other Agriculture, Fishing and Forestry
Cancelled
Upper Egypt Integrated Governorates Development
Nationwide
Specific Investment Loan
0%
Development
Proposed
Embedding Support to Egypt Education Reform Project
Nationwide
Investment Project Financing
0%
Development
Cancelled
Green, Inclusive, and Resilience Development Policy Loan
Nationwide
Development Policy Lending
0%
Development
Cancelled
Power Sector Investment Project
Nationwide
Specific Investment Loan
0%
Other Industry, Trade and Services
Completed
Egypt: Sustainable POPs Management Project
Nationwide
Investment Project Financing
0%
Development
Cancelled
Modernization of Egyptian Property Registration Project
Nationwide
Investment Project Financing
0%
Public Administration - Water, Sanitation and Waste Management
Completed
Alexandria Coastal Zone Management Project (Under the Investment Fund for the Mediterranean Sea Large Marine Ecosystem)
Nationwide
Investment Project Financing
0%
Other Education
Cancelled
Egypt Education Reform Program
Nationwide
Specific Investment Loan
0%
Development
Cancelled
Agricultural Extension and Marketing Assistance Project
Nationwide
Sector Investment and Maintenance Loan
0%
Postal services
Cancelled
Egypt - ICT Development Support
Nationwide
Specific Investment Loan
0%
Roads and highways
Cancelled
EG-GREATER CAIRO DEVELOPMENT PROJECT
Nationwide
Specific Investment Loan
0%
Ports/Waterways
Completed
Suez Canal Rehabilitation Project
Nationwide
Specific Investment Loan
0%
Central Government (Central Agencies)
Completed
Support to the Preparation of Egypt’s First National Strategy for Development of Statistics
Nationwide
Investment Project Financing
0%
Development
Proposed
Catalyzing Finance for MSMEs and Innovative Ventures in Egypt
Nationwide
Investment Project Financing
0%
Public Administration - Industry, Trade and Services
Completed
Equal Access and Simplified Environment for Investment (EASE) in Egypt
Nationwide
Investment Project Financing
0%
Development
Cancelled
Private Sector Export Development Project
Nationwide
Specific Investment Loan
0%
Development
Cancelled
First FOSTERING A COMPETITIVE, RESILIENT AND GREEN ECONOMY DPF
Nationwide
Development Policy Lending
0%
Social Protection
Completed
Emergency Employment Investment Project
Nationwide
Investment Project Financing
0%
Development
Proposed
Implementation of Egypt’s State Ownership Policy PforR
Nationwide
Program-for-Results Financing
0%
Development
Proposed
Egypt Higher Education for Economic Transformation Project
Nationwide
Investment Project Financing
0%
Development
In progress
Generating Resilience, Opportunities, and Welfare for a Thriving Egypt (GROWTH)
Nationwide
Development Policy Lending
0%
Social Protection
In progress
Takaful and Karama Cash Transfer Expansion and Systems Building Project
Nationwide
Investment Project Financing
0%
Railways
In progress
Cairo Alexandria Trade Logistics Development Project
Nationwide
Investment Project Financing
0%
Agricultural markets, commercialization and agri-business
In progress
Emergency Food Security and Resilience Support Project
Nationwide
Investment Project Financing
0%
Other Non-bank Financial Institutions
Completed
Egypt Inclusive Growth For Sustainable Recovery
Nationwide
Development Policy Lending
0%
Railways
In progress
Railway Improvement and Safety for Egypt Project
Nationwide
Investment Project Financing
0%
Waste Management
In progress
Greater Cairo Air Pollution Management and Climate Change Project
Nationwide
Investment Project Financing
0%
Health
In progress
Supporting Egypt’s Universal Health Insurance System
Nationwide
Investment Project Financing
0%
Housing Construction
In progress
EG Inclusive Housing Finance Program Additional Financing
Nationwide
Program-for-Results Financing
0%
Other Industry, Trade and Services
Completed
Equal Access and Simplified Environment for Investment Project - Additional Financing
Nationwide
Investment Project Financing
0%
Social Protection
Completed
Strengthening Social Safety Net Additional Financing
Nationwide
Investment Project Financing
0%
Other Non-bank Financial Institutions
In progress
Catalyzing Entrepreneurship for Job Creation
Nationwide
Investment Project Financing
0%
Central Government (Central Agencies)
Completed
Private Sector Development for Inclusive Growth DPF
Nationwide
Development Policy Lending
0%
Sanitation
In progress
AF to Sustainable Rural Sanitation Services Program
Nationwide
Program-for-Results Financing
0%
Health
In progress
Transforming Egypt's Healthcare System Project
Nationwide
Investment Project Financing
0%
Primary Education
In progress
Supporting Egypt Education Reform Project
Nationwide
Investment Project Financing
0%
Other Energy and Extractives
Completed
Third Fiscal Consolidation, Sustainable Energy & Competitiveness DPF
Nationwide
Development Policy Lending
0%
Other Industry, Trade and Services
Completed
Second Fiscal Consolidation, Sustainable Energy & Competitiveness DPF
Nationwide
Development Policy Lending
0%
Sub-National Government
In progress
Upper Egypt Local Development PforR
Nationwide
Program-for-Results Financing
0%
Central Government (Central Agencies)
Completed
First Fiscal Consolidation, Sustainable Energy and Competitiveness DPF
Nationwide
Development Policy Lending
0%
Sanitation
In progress
Sustainable Rural Sanitation Services Program for Results
Nationwide
Program-for-Results Financing
0%
Banking Institutions
In progress
Inclusive Housing Finance Program
Nationwide
Program-for-Results Financing
0%
Social Protection
Completed
Strengthening Social Safety Net Project
Nationwide
Investment Project Financing
0%
Urban Development
In progress
New Administrative Capital
Nationwide
$58B (estimated)
50%
Maritime
Completed
New Suez Canal
Nationwide
$8.5B
100%
Banking Institutions
Completed
Inclusive Regulations for Microfinance
Nationwide
Investment Project Financing
0%
Oil and Gas
Completed
EG: Household Natural Gas Connection Project
Nationwide
Investment Project Financing
0%
Banking Institutions
Completed
Promoting Innovation for Inclusive Financial Access
Nationwide
Investment Project Financing
0%
Non-Renewable Energy Generation
Completed
EG - Helwan South Power Project
Nationwide
Investment Project Financing
0%
Social Protection
Completed
Egypt Emergency Labor Intensive Investment Project
Nationwide
Investment Project Financing
0%
Sanitation
Completed
Second Integrated Sanitation and Sewerage Project - EG
Nationwide
Investment Project Financing
0%
Railways
Completed
EG-Railways Restructuring Additional Financing
Nationwide
Specific Investment Loan
0%
Irrigation and Drainage
Completed
EGYPT-Farm-level Irrigation Modernization
Nationwide
Investment Project Financing
0%
Other Transportation
Completed
Egypt Vehicle Scrapping and Recycling Program
Nationwide
Investment Project Financing
0%
Renewable Energy Biomass
Completed
Egypt - Wind Power Development Project
Nationwide
Investment Project Financing
0%
Non-Renewable Energy Generation
Completed
EG-Giza North Power Project
Nationwide
Investment Project Financing
0%
Banking Institutions
Completed
Third Financial Sector Development Policy Loan
Nationwide
Development Policy Lending
0%
Irrigation and Drainage
Completed
EG-National Drainage II Add. Financing
Nationwide
Specific Investment Loan
0%
Banking Institutions
Completed
Egypt Enhancing Access to Finance for Micro and Small Enterprises
Nationwide
Investment Project Financing
0%
Public Administration - Transportation
Completed
Cairo Airport Development Project-TB2
Nationwide
Investment Project Financing
0%
Public Administration - Health
Completed
Health Care Quality Improvement Project
Nationwide
Investment Project Financing
0%
Banking Institutions
Completed
Affordable Mortgage Finance DPL
Nationwide
Development Policy Lending
0%
Railways
Completed
Egypt National Railways Restructuring Project
Nationwide
Investment Project Financing
0%
Non-Renewable Energy Generation
Completed
EG-Ain Sokhna Power Project
Nationwide
Investment Project Financing
0%
Waste Management
Completed
EG-LAND FILLING AND PROCESING SERVICES FOR SOUTHERN ZONE IN CAIRO
Nationwide
World Bank
0%
Banking Institutions
Completed
Financial Sector Development Policy Loan II
Nationwide
Development Policy Lending
0%
Sanitation
Completed
Integrated Sanitation& Sewerage Infrastructure Project
Nationwide
Investment Project Financing
0%
Oil and Gas
Completed
EG-Natural Gas Connections Project
Nationwide
Investment Project Financing
0%
Urban Transport
Completed
EGYPT-ALEXANDRIA DEVELOPMENT PROJECT
Nationwide
Specific Investment Loan
0%
Irrigation and Drainage
Completed
West Delta Water Conservation and Irrigation Rehabilitation Project
Nationwide
Investment Project Financing
0%
Banking Institutions
Completed
EG-MORTGAGE FINANCE
Nationwide
Investment Project Financing
0%
Other Industry, Trade and Services
Completed
Second Pollution Abatement Project
Nationwide
Investment Project Financing
0%
Waste Management
Completed
ONYX solid Waste Alexandria - Carbon
Nationwide
World Bank
0%
Other Energy and Extractives
Completed
EG-El Tebbin Power
Nationwide
Investment Project Financing
0%
Irrigation and Drainage
Completed
EGYPT-Integrated Irrigation Improvement and Management Project
Nationwide
Investment Project Financing
0%
Early Childhood Education
Completed
Early Childhood Education Enhancement Project (ECEEP)
Nationwide
Investment Project Financing
0%
Aviation
Completed
EG-AIRPORTS DEVELOPMENT PROJECT
Nationwide
Specific Investment Loan
0%
Workforce Development and Vocational Education
Completed
SKILLS DEVELOPMENT PROJECT
Nationwide
Investment Project Financing
0%
Sub-National Government
Completed
Egypt - Exhibition on Mediterranean City
Nationwide
Technical Assistance Loan
0%
Other Non-bank Financial Institutions
Completed
Second Matruh Resource Management Project
Nationwide
Specific Investment Loan
0%
Other Agriculture, Fishing and Forestry
Completed
Matruh Resource Management (02) Project
Nationwide
Specific Investment Loan
0%
Tertiary Education
Completed
Higher Education Enhancement Project
Nationwide
Specific Investment Loan
0%
Irrigation and Drainage
Completed
The Second National Drainage Project
Nationwide
Investment Project Financing
0%
Social Protection
Completed
Social Protection Initiatives Project
Nationwide
Learning and Innovation Loan
0%
Agricultural markets, commercialization and agri-business
Completed
Egypt - Private Sector and Agriculture Development
Nationwide
Specific Investment Loan
0%
Social Protection
Completed
Social Fund for Development Project (03)
Nationwide
Specific Investment Loan
0%
Secondary Education
Completed
Secondary Education Enhancement Project
Nationwide
Investment Project Financing
0%
Other Agriculture, Fishing and Forestry
Completed
Sohag Rural Development Project
Nationwide
Specific Investment Loan
0%
Irrigation and Drainage
Completed
Pumping Stations Rehabilitation III
Nationwide
Sector Investment and Maintenance Loan
0%
Health
Completed
Health Sector Reform
Nationwide
Sector Investment and Maintenance Loan
0%
Central Government (Central Agencies)
Completed
Port Sector Reform Project
Nationwide
Learning and Innovation Loan
0%
Other Industry, Trade and Services
Completed
Egypt Pollution Abatement Project
Nationwide
Sector Investment and Maintenance Loan
0%
Micro- and SME finance
Completed
East Delta Newlands Agricultural Services Project
Nationwide
Investment Project Financing
0%
Primary Education
Completed
Egypt Education Enhancement Project
Nationwide
Sector Investment and Maintenance Loan
0%
Micro- and SME finance
Completed
Social Fund Project (02)
Nationwide
Specific Investment Loan
0%
Health
Completed
Egypt Population Project
Nationwide
Specific Investment Loan
0%
Irrigation and Drainage
Completed
Irrigation Improvement Project
Nationwide
Specific Investment Loan
0%
Agricultural Extension, Research, and Other Support Activities
Completed
Agricultural Modernization Project
Nationwide
Specific Investment Loan
0%
Other Agriculture, Fishing and Forestry
Completed
Red Sea Coastal and Marine Resource Management Project
Nationwide
Specific Investment Loan
0%
Other Industry, Trade and Services
Completed
Structural Adjustment Loan Project
Nationwide
Structural Adjustment Loan
0%
Power
Completed
Power Project (04)
Nationwide
Specific Investment Loan
0%
Agricultural markets, commercialization and agri-business
Completed
Agricultural Storage Project
Nationwide
Specific Investment Loan
0%
(Historic)Urban water supply
Completed
Alexandria Water Distribution Project
Nationwide
Specific Investment Loan
0%
Irrigation and Drainage
Completed
Channel Maintenance Project
Nationwide
Specific Investment Loan
0%
Vocational training
Completed
Vocational Training Project (03)
Nationwide
Specific Investment Loan
0%
Ports/Waterways
Completed
Port Said Port Expansion and Rehabilitation Project
Nationwide
Specific Investment Loan
0%
Irrigation and Drainage
Completed
Drainage Project (05)
Nationwide
Specific Investment Loan
0%
(Historic)Agriculture adjustment
Completed
Agricultural Development Project (02)
Nationwide
Specific Investment Loan
0%
(Historic)Electric power and other energy adjustment
Completed
POWER (SUPPL)
Nationwide
Specific Investment Loan
0%
(Historic)Other industry
Completed
Construction Industry Project
Nationwide
Financial Intermediary Loan
0%
(Historic)Industrial adjustment
Completed
Export Industries Development Project
Nationwide
Financial Intermediary Loan
0%
(Historic)Small scale enterprise
Completed
Small and Medium Scale Industry Project
Nationwide
Financial Intermediary Loan
0%
(Historic)Other water supply and sanitation
Completed
Water Supply and Sewerage Engineering in Dagaliya Damietta and Beheira Project
Nationwide
Technical Assistance Loan
0%
(Historic)Rural roads
Completed
Road Maintenance Project
Nationwide
Sector Investment and Maintenance Loan
0%
(Historic)Other industry
Completed
El Dikheila Steel Project
Nationwide
Specific Investment Loan
0%
Irrigation and Drainage
Completed
Irrigation Pumping Stations Rehabilitation Project
Nationwide
Specific Investment Loan
0%
Vocational training
Completed
Vocational Training Project
Nationwide
Specific Investment Loan
0%
(Historic)Agricultural credit
Completed
Agro Industry Project (02)
Nationwide
Sector Investment and Maintenance Loan
0%
Ports/Waterways
Completed
El Dikheila Port Project
Nationwide
Specific Investment Loan
0%
(Historic)Urban management
Completed
Greater Cairo Urban Development Project
Nationwide
Sector Investment and Maintenance Loan
0%
(Historic)Oil and gas exploration and development
Completed
Abu Qir Gas Development Project
Nationwide
Specific Investment Loan
0%
(Historic)Financial sector development
Completed
Development Industrial Bank Project (05)
Nationwide
Financial Intermediary Loan
0%
(Historic)Telecommunications and informatics
Completed
Telecommunications Project (03)
Nationwide
Sector Investment and Maintenance Loan
0%
(Historic)Other agriculture
Completed
Technical Assistance Project
Nationwide
Technical Assistance Loan
0%
(Historic)Urban water supply
Completed
Beheira Provincial Water Supply Project
Nationwide
Specific Investment Loan
0%
(Historic)Industrial restructuring
Completed
Hadisolb Rehabilitation Project
Nationwide
Specific Investment Loan
0%
Fisheries
Completed
Fish Farming Project
Nationwide
Specific Investment Loan
0%
Irrigation and Drainage
Completed
New Land Development Project
Nationwide
Specific Investment Loan
0%
(Historic)Oil and gas exploration and development
Completed
Abu Gharadig - Western Desert Petroleum Exploration Project
Nationwide
Specific Investment Loan
0%
Vocational training
Completed
Education Project (03)
Nationwide
Specific Investment Loan
0%
(Historic)Thermal
Completed
Power Project (03)
Nationwide
Specific Investment Loan
0%
(Historic)Other industry
Completed
Pulp and Paper Project
Nationwide
Specific Investment Loan
0%
(Historic)Refining, storage and distribution
Completed
Cairo Gas Distribution Project
Nationwide
Specific Investment Loan
0%
(Historic)Financial sector development
Completed
MISR Iran Development Bank Project
Nationwide
Financial Intermediary Loan
0%
(Historic)Other industry
Completed
Textiles Project (02)
Nationwide
Specific Investment Loan
0%
(Historic)Agricultural credit
Completed
Agro Industry Project (01)
Nationwide
Financial Intermediary Loan
0%
(Historic)Financial sector development
Completed
Development Industrial Bank Project (04)
Nationwide
Financial Intermediary Loan
0%
(Historic)Refining, storage and distribution
Completed
Gulf of Suez Gas Project
Nationwide
Specific Investment Loan
0%
(Historic)Thermal
Completed
Shoubra El Kheima Thermal Power Project
Nationwide
Sector Investment and Maintenance Loan
0%
(Historic)Other urban development
Completed
Tourism Project
Nationwide
Sector Investment and Maintenance Loan
0%
(Historic)Public sector management adjustment
Completed
New Valley Phosphate Engineering Project
Nationwide
Specific Investment Loan
0%
(Historic)Other education
Completed
Education Project (02)
Nationwide
Specific Investment Loan
0%
(Historic)Targeted health
Completed
Population Project (02)
Nationwide
Sector Investment and Maintenance Loan
0%
(Historic)Urban management
Completed
Urban Development Project
Nationwide
Sector Investment and Maintenance Loan
0%
(Historic)Agriculture adjustment
Completed
Agriculture Development Project
Nationwide
Financial Intermediary Loan
0%
(Historic)Financial sector development
Completed
Development Industrial Bank Project (03)
Nationwide
Financial Intermediary Loan
0%
(Historic)Telecommunications and informatics
Completed
Telecommunications Project (02)
Nationwide
Sector Investment and Maintenance Loan
0%
(Historic)Urban water supply
Completed
Water Supply Engineering and Technical Assistance Project
Nationwide
Technical Assistance Loan
0%
Ports/Waterways
Completed
Suez Canal Expansion Project
Nationwide
Specific Investment Loan
0%
(Historic)Mining and other extractive
Completed
Bahariya Iron Ore Benefication Project
Nationwide
Technical Assistance Loan
0%
(Historic)Trade policy reform
Completed
Agricultural Industrial Imports Project (02)
Nationwide
Structural Adjustment Loan
0%
(Historic)Distribution and transmission
Completed
Rural Electrification Project
Nationwide
Sector Investment and Maintenance Loan
0%
Irrigation and Drainage
Completed
Nile Delta Drainage Project (02)
Nationwide
Specific Investment Loan
0%
Vocational training
Completed
Education Project
Nationwide
Specific Investment Loan
0%
(Historic)Urban water supply
Completed
Alexandria Water Supply Project
Nationwide
Specific Investment Loan
0%
(Historic)Other industry
Completed
Textiles Project
Nationwide
Specific Investment Loan
0%
Irrigation and Drainage
Completed
Upper Egypt Drainage Project (02)
Nationwide
Specific Investment Loan
0%
(Historic)Annual crops
Completed
Fruit and Vegetable Project
Nationwide
Financial Intermediary Loan
0%
Ports/Waterways
Completed
Alexandria Port Project
Nationwide
Specific Investment Loan
0%
(Historic)Financial sector development
Completed
Bank of Alexandria Project (02)
Nationwide
Financial Intermediary Loan
0%
(Historic)Telecommunications and informatics
Completed
Telecommunications Project
Nationwide
Sector Investment and Maintenance Loan
0%
Railways
Completed
Railway Project (02)
Nationwide
Specific Investment Loan
0%
(Historic)Other industry
Completed
Tourah Cement Expansion Project
Nationwide
Specific Investment Loan
0%
(Historic)Industrial adjustment
Completed
Agricultural Industrial Imports Project
Nationwide
Structural Adjustment Loan
0%
(Historic)Fertilizer and other chemicals
Completed
Talkha Fertilizer Project (02)
Nationwide
Specific Investment Loan
0%
(Historic)Fertilizer and other chemicals
Completed
Talkha Area Fertilizer Project
Nationwide
Technical Assistance Loan
0%
(Historic)Targeted health
Completed
Population Project
Nationwide
Sector Investment and Maintenance Loan
0%
(Historic)Other industry
Completed
Cotton Ginning Rehabilitation Project
Nationwide
Sector Investment and Maintenance Loan
0%
(Historic)Financial sector development
Completed
Bank of Alexandria Project
Nationwide
Financial Intermediary Loan
0%
Irrigation and Drainage
Completed
Upper Egypt Drainage Project
Nationwide
Specific Investment Loan
0%
(Historic)Industrial adjustment
Completed
Cotton Ginning Project
Nationwide
Technical Assistance Loan
0%
Railways
Completed
Railway Project
Nationwide
Specific Investment Loan
0%
Irrigation and Drainage
Completed
Nile Delta Drainage Project
Nationwide
Specific Investment Loan
0%
Ports/Waterways
Completed
Suez Canal Development Project
Nationwide
Specific Investment Loan
0%
Discuss Egypt on the forum